
A factory you can audit, not just quote
Production floor, QC process, and certification records — documented and available. Western procurement teams have verified our manufacturing infrastructure firsthand.


Assembly documented at every stage
Each reel passes through stamping, socket fitting, wiring, and load testing on dedicated stations. Process records are retained per batch for traceability.
Plastic and iron lines run on separate tooling. Socket variants — UK, US, EU, German, French, Australian — are fitted and torque-tested before final inspection.
Factory floor access for third-party audits is available by appointment. Pre-shipment inspection by SGS or equivalent is supported on all orders.
Certifications verified, documentation available
CE & RoHS
Socket Approvals
Audit Support
All reel models carry CE marking under the Low Voltage Directive. RoHS compliance documentation is current and issued per product SKU.
BS 1363 (UK), NEMA 5-15 (US), Schuko (DE/EU), NF (FR), and AS/NZS 3112 (AU) socket variants each carry their respective country approval certificates.
Test reports, material declarations, and factory inspection records are issued on request. SGS and Bureau Veritas pre-shipment inspection supported.
500,000 units / year
25–35 day lead time
100% socket tested
Standard production lead time from confirmed order to pre-shipment inspection. No hidden queue variables.
Every unit's socket assembly is electrically tested before final packaging. Batch failure rate data available on request.
Annual production capacity across plastic and iron lines, confirmed by factory floor records.
Documentation packages — CE declarations, test reports, material certificates — dispatched within one business day of request.
